

At right, Verizon workers replace one of two fallen utility pole on Washington Street that have inhibited the return of electrical service to Red Bank’s East Side, officials said. At 4 p.m., a Verizon worker said the second pole would be up and ready for JCP&L to do its thing within the hour. (Photo at right by Rebecca Desfosse. Click to enlarge)