SEA BRIGHT: DONOVAN’S REBUILD BEGINS

donovan's 052616donovan's 071015 3Obliterated by Hurricane Sandy in 2012 and revived last summer as an open-air bar (seen at right), Sea Bright’s Donovan’s Reef is finally on track to having a permanent home again, NJ.com reports. The oceanfront watering hole is two weeks into a construction project that’s estimated to take about 10 months, the news site reports.

“I’m looking forward to the return of a Donovan’s that, like the rest of the new Seas Bright, is built to last,” Mayor Dina Long told NJ.com. “Donovan’s is an integral piece of the Sea Bright fabric. Without Donovan’s in Sea Bright, it feels like something’s missing.” (Photos by John T. Ward. Click to enlarge)

 

SEA BRIGHT: DONOVAN’S TIKI BAR REOPENS

donovan's 071015 3With new access ramps over the sea wall, the restored tiki bar at Donovan’s was back in business Friday afternoon, as co-owner Chris Bowler announced via the signboard, below. (Photos by John T. Ward. Click to enlarge)

By JOHN T. WARD

donovan's 071015 1Thirty-two months after it was knocked cold by Hurricane Sandy, a Sea Bright watering hole stirred back to life in limited form Friday afternoon.

Employees of Donovan’s Reef, which had been a magnet to Wall Street millionaires and Side Street store clerks alike, threw open a fenced gate to its beachfront tiki bar shortly before 3 p.m., marking the end of a long, frustrating struggle, its owners said.

Read More »