Obliterated by Hurricane Sandy in 2012 and revived last summer as an open-air bar (seen at right), Sea Bright’s Donovan’s Reef is finally on track to having a permanent home again, NJ.com reports. The oceanfront watering hole is two weeks into a construction project that’s estimated to take about 10 months, the news site reports.
“I’m looking forward to the return of a Donovan’s that, like the rest of the new Seas Bright, is built to last,” Mayor Dina Long told NJ.com. “Donovan’s is an integral piece of the Sea Bright fabric. Without Donovan’s in Sea Bright, it feels like something’s missing.” (Photos by John T. Ward. Click to enlarge)
Remember: Nothing makes a Red Bank friend happier than to hear "I saw you on Red Bank Green!"
redbankgreen Classics
Partyline
“That should be on Red Bank Green!”
If you've ever thought that, join the 24 readers who've signed up to post their own stories on Red Bank Green.