Skip to content

A town square for an unsquare town

redbankgreen

Standing for the vitality of Red Bank, its community, and the fun we have together.

BUY-IN ON NEW SEA BRIGHT BRIDGE ELUSIVE

Below, dozens of local residents turned out in Sea Bright Monday for a midday presentation of options for dealing with the “serious” condition of the Rumson-Sea Bright Bridge. (Click to enlarge)

By STACIE FANELLI

Sixty years old, the Rumson-Sea Bright Bridge over the Shrewsbury River is rapidly corroding, inadequate for today’s traffic loads and behind the times on accident safety. Its electrical system is the same one installed in 1952. It’s not up to snuff in terms of earthquake resistance, either.

In a word, Monmouth County engineering officials say, the bridge’s condition is “serious.”

Whether to spend an estimated $10 million to rehabilitate the bridge or some $50 million to replace it was the core question at a pair of public hearings held Monday in Sea Bright and Rumson. More than a dozen county officials and consultants were present at each to kick off a series of discussions aimed, they said, at “building consensus” on a solution.

But some residents of the two towns voiced skepticism that their concerns – which include the impacts of a new span on property values on the Rumson side and on the business district in Sea Bright – would be given much weight in the process.

“They seem to have it in mind to build a new bridge, and I just don’t want it destroying the neighborhood in the process,” said Tom Calvanico, who lives near the Rumson anchorage.

The bridge, designated S-32, was the focus of an open-house style meeting in Rumson Monday night, as well as at a separate meeting in Sea Bright earlier in the day. Thirteen members of the project team were on hand to answer questions about traffic, design, engineering and the environmental impact of several courses of action.

On the table are replacing the low drawbridge or building a high fixed bridge, which would mean road realignment and a possible loss of private property, officials acknowledged.

“Doing nothing is not an option. At some point, something has to be done,” Martine Culbertson, a community involvement facilitator hired by the county, told the Rumson audience.

But as in Sea Bright earlier, the Rumson Q&A session elicited concern over whether the community’s voices would actually matter in the final decision of the preferred alternative that will be presented to the federal government.

“This just reminds me of Sandy Hook,” said Rumson resident Phil Wagner, referring to the replacement of the Route 36 Highlands Bridge with the new Joe Azzolina Bridge. “Everybody was listened to and all of a sudden, hocus pocus, a decision was made.”

Jon Moren, the county’s principal engineer for bridges, repeatedly assured the audiences that no decision has been made regarding any aspect of the bridge’s construction, including whether construction will ever occur. And team members stressed that in order for the project to qualify for federal funding, Uncle Sam requires them to weigh all options. He encouraged residents to comment in writing with their objections to a fixed bridge.

While a drawbridge would allow for the structure to stay where it is, an issue of funding concerned the crowd. Glen Schetelich, project manager from the engineering firm Hardesty and Hanover, refuted the rumor that the federal government is not interested in funding movable bridges because of maintenance.

“It’s project by project,” he said. “I’ve worked on drawbridges that were replaced with drawbridges.”

The estimate is $10 million to repair only what has been damaged up until now. That does not include preventative construction or replacement, which could come with a budget of over $50 million, said Moren, who added that the county typically spends only $10 million per year on bridges altogether.

All funding is expected to come from the federal government, through the North Jersey Transportation Planning Authority, but only if the project team follows the procedures outlined by the National Environmental Policy Administration (NEPA), which include holding Monday’s public informational meetings.

The meeting “is one of the early litmus tests the Federal Highway Administration will take a look at,” Culbertson told the Rumson crowd.

A traffic survey will be conducted during the summer, the peak of bridge use, to address concerns about congestion.

Moren, who is also the project manager of the Oceanic Bridge project, said construction would not happen on both bridges at once. He confirmed that the current closure of the Oceanic is on schedule to end before next Memorial Day, which is when only the first phase of the Rumson-Sea Bright bridge would be completed.

If Rumson, Sea Bright and the county cannot reach a consensus, though, the team will have to go off course from the schedule put in place by NEPA and will lose its federal funding. The first phase of planning, “local concept development” is 18 months long and should end by April 2013. If everyone agrees on the type of bridge to build and how to do it, they will then go into the engineering, design and construction phases.

Members of the team could not comment on how long construction might last or when it would begin because no one has agreed that it will be built yet. But there seemed to be a consensus opposition to a completely new span.

“That bridge would have to be so huge that it would have to start at Holy Cross and end in the ocean. You would have to build a monstrosity,” said Rumson resident Ingeborg Perndorfer.

“Stakeholders,” which the officials said includes fire and police departments from both municipalities, Holy Cross School, the two hospitals, marinas, bordering towns and local business owners, already met with the project team earlier this month to discuss their apprehension. The most notable bullet was keeping the bridge open during construction.

The bridge is a vital part of the evacuation on Route 520, but community members cited the last time it underwent repairs as a main concern. It was the early 90s and the bridge was shut down entirely for about three months.

“Business in Sea Bright practically died,” said Rumson resident Jude Skowron.

The next public information meeting will be held in October, when the data collection is finished and the preferred alternative for the bridge will be presented, officials said.

Stacie Fanelli, a sophomore at Syracuse University, is a reporting and photography intern at redbankgreen

 

Remember: Nothing makes a Red Bank friend happier than to hear "I saw you on Red Bank Green!"
Partyline
RIVERSIDE FLOW
New Jersey Flow Arts brings together jugglers, poi spinners, hoopers and more weekly in Riverside Gardens Park.
Honeybee swarm carted away
Beekeeper Tanya Ptak of Ptak’s Apiary inspects a swarm of honeybees that chose a flower pot in the courtyard of Red Bank Primary Schoo ...
BELOVED POISONED DOG PHOTO SURFACES
   
THREE ON TOUR
RED BANK: Three borough sites will participate in a weekend of self-guided tours of 52 historic locations in Monmouth County May 4 & 5.
VOLUNTEERS GET INTO THE WEEDS
Toting plastic trash bags, 51 volunteers conducted a walking litter cleanup on Red Bank's West Side Saturday.
“IT’S A PARTY AT WAWA!”
You wish you could vibe like Brian, who lives on the other side of Hubbard’s Bridge. He caught redbankgreen’s attention in Red B ...
POPE OKS ORATORY
RED BANK: St. Anthony of Padua obtains papal approval to establish Oratory of St. Philip Neri, a community of priests and brothers devoted t ...
RED BANK: NEW MURAL BRIGHTENS CORNER
RED BANK: Lunch Break founder Norma Todd is depicted in a mural painted this week on the front of the newly renovated social service agency.
TULIPS TOGETHER
Spring tulips taking in the sunset outside the Molly Pitcher Inn in Red Bank Monday evening.
RIVER RANGERS RETURN
River Rangers, a summer canoeing program offered by the Navesink Maritime Heritage Association, returns this summer for up to 20 participa ...
DOUBLE DYLAN IN RED BANK
Trucks for a production company filming what one worker said was a Bob Dylan biography have lined Monmouth Street the past two days with cre ...
AFTER THE RAIN
A pear tree branch brought down by a brief overnight storm left a lovely tableau on the sidewalk in front of Red Bank's Riverside Gardens Pa ...
CONE OF UNCERTAINTY
Asked by a redbankgreen reporter why these cones were on top of cars, the owner of the car in the foreground responded: “That’s ...
RAIL RIDER’S VIEW
A commuter's view of Cooper's Bridge and the Navesink River from North Jersey Coast Line train 3320 out of Red Bank Tuesday morning.
PUT ME IN COACH!
Red Bank T-Ball kicked off at East Side park on Saturday morning. The brisk weather proved to be no deterrent to the young players, ranging ...
IT’S A SIGN!
Once proudly declaring its all-but-certain arrival in Spring 2019, the project previously known as Azalea Gardens springs to life again with ...
SPRINGTIME MEMORIES OF CARL
The Easter Bunny getup and St. Patrick’s Day hat that belonged to longtime Red Bank crossing guard and neighborhood smile-creator Carl ...
RED TRUCKS AT RED ROCK
A small dishwasher fire at Red Rock Tap and Grill was put out quickly by firefighters overnight, causing minimal damage. Red Bank Fire Depar ...
CREATIVE COVER UP
The windows of Pearl Street Consignment on Monmouth Street were smashed when a driver crashed their car through them injuring an employee la ...
THEY’RE BACK!
Ospreys returned to the skies over Red Bank this week for the first time since they migrated to warmer climes in late fall. With temperature ...